Skip to content
Boat Builder Indonesia
How we build

Our proven methodology for phinisi construction

Ancient craftsmanship, modern engineering and meticulous project management — a structured process that de-risks your build and keeps it transparent, on schedule and on budget.

Four phases

From first workshop to classification

A clear sequence from conception to delivery, each phase with its own deliverables and checks.

  1. 01

    Discovery & naval architecture

    Months 1–3. A client vision workshop, concept design and General Arrangement, a line-item specification and budget, then a full shipbuilding contract.

  2. 02

    Materials & hull construction

    Months 4–12. Certified ironwood and teak are graded batch by batch, the keel is blessed, and the hull rises by traditional techniques.

  3. 03

    Superstructure & systems

    Months 13–20. Decks, cabins and wheelhouse are framed from CAD drawings; engines and shafts are laser-aligned, then wiring, plumbing and HVAC installed.

  4. 04

    Interiors, sea trials & class

    Months 21–24. Specialist teams fit the interiors, every system is commissioned, then sea trials and a BKI survey lead to the classification certificate.

Every batch of timber, verified
Timber selection

Every batch of timber, verified

We source only legally certified (SVLK) ulin ironwood for the keel and hull, and teak for the superstructure and decking — each batch scored against our internal rubric.

Then tradition takes over: a keel-laying ceremony blesses the build, and our Panrita Lopi raises the hull without formal blueprints while our project managers document every step.

<18%

Maximum moisture content

1–5

Grain density score

SVLK

Certified, pass or fail

Quality built in

Checks at every stage

Transparency is engineered into the process, from the contract you sign to the certificate your yacht receives.

Checks at every stage
  • Contract & legal

    Milestones, payment schedules and delivery terms are set out in a comprehensive shipbuilding contract, managed by our in-house legal counsel.

  • Partner audits

    Regular site visits and quality audits of our key engine, generator and electronics suppliers.

  • Sea trials

    Stability, manoeuvrability, speed and endurance tested to a strict checklist — emergency stops, turning circles and a 24-hour continuous engine run.

  • BKI classification

    Biro Klasifikasi Indonesia surveyors make a final inspection against national safety and construction standards, then issue the classification certificate.

Begin the conversation

Start your build with a clear plan

Tell us about your vision and we’ll walk you through each phase, from the first workshop to classification.